Most conference problems aren't solved on the day. They're solved (or quietly created) in the weeks and months before, by whether the right things were locked in at the right times.
This is a timeline-based production checklist you can use immediately. Six stages from three months out to event day. Each stage covers what needs to be confirmed and why it matters at that point in the schedule. Designed to be saved, printed, or shared in a planning meeting.
Key takeaways
- Conference production runs on a timeline. Late decisions cost more and create avoidable risk.
- AV companies should be booked around three months out for most conferences. Earlier for larger or peak-season events.
- Floor plans, run sheets (the minute-by-minute running order) and equipment lists belong in the brief by six to eight weeks out.
- A tech rehearsal with presenters is non-negotiable. Schedule it before the event week, not on the morning of.
- What looks like a "small thing missed" on bump-in day (when the crew sets up) was almost always a "small thing missed" months earlier in the timeline.
How to use this checklist
Six timeline stages cover the full arc from initial booking through to event day. Work backwards from your event date. At each stage, the checklist covers what needs to be confirmed and why that timing matters.
Not every item applies to every conference. The principle is the same regardless of scale: small events follow the same shape, just compressed. If you're still choosing a production partner, our conference AV buyer's guide covers the bigger decisions, and our corporate AV hire guide shows what a typical setup includes.
Who owns what: venue vs AV company vs you
Before working through the timeline, it's worth being clear about who owns what across a conference production. Most conferences have three parties making decisions, and confusion about which one owns which task is the most common reason items fall through.
- Venue: room access and access times, in-house AV equipment (where used), catering, security, parking, building services.
- AV company: production scope, crew, equipment beyond what the venue provides, run-sheet operation on the day, content management.
- You (the organiser): speakers and presenters, agenda and run sheet, brand assets and content, attendee communications, sponsor and stakeholder management.
Some items sit at the overlap. Confidence monitors (screens facing the stage so presenters can see their slides) might come from the venue or the AV company depending on the contract. Slide content originates with the speakers but lives operationally with the AV crew during the event. Clarify ownership at the start of the project and revisit at each stage of the timeline below.

The checklist
3 months out
Strategic decisions. Anything booked or confirmed at this stage shapes everything that follows.
- AV company booked for the event date.
- Venue confirmed, AV assessment completed (what the venue provides, what you'll need to bring in).
- Event format confirmed: single room or multi-room, single day or multi-day.
- Plenary vs breakout structure agreed (the main session everyone attends, and any smaller sessions in separate rooms).
- Budget envelope agreed internally.
- Key stakeholders briefed on production scope and timeline.
6-8 weeks out
Briefing depth. The information your AV company needs to scope the production properly.
- Floor plan shared with AV company.
- Draft run sheet shared (timing, segments, speakers).
- Equipment list confirmed (LED wall or projection, audio, lighting, recording).
- IMAG (live camera shots of the presenter on the big screens) and recording decisions confirmed or ruled out.
- Branding requirements shared (logos, brand colours, on-screen template).
- Sponsor visibility requirements confirmed.
- AV brief sent if not already shared.
2-4 weeks out
Speaker and content milestones. By this stage the people are confirmed and content is moving into place.
- Final speaker list confirmed.
- Microphone preferences confirmed for each speaker (lapel, a small clip-on mic; handheld; headset; or a fixed lectern mic).
- Slide deck format and aspect ratio (the shape of the slides, usually 16:9 widescreen) confirmed with speakers.
- Content delivery deadlines communicated to speakers.
- Bump-in window (setting up) and venue access times confirmed.
- Bump-out window (packing down) confirmed.
- Rehearsal time blocked in the run sheet.
1 week out
Final prep. The last opportunity to find and fix issues before event week.
- Final run sheet shared with the AV company and key stakeholders.
- Tech rehearsal scheduled with crew and presenters.
- All speaker content received and tested.
- Speaker order and timing locked.
- Q&A microphone plan agreed (handheld, a roving mic carried to people in the audience, or a fixed audience mic).
- Day-of contact list shared (your team, AV crew lead, venue contact).
- Wet-weather or contingency plans confirmed if applicable.
Day before or morning of
Bump-in. The production goes from plan to reality.
- Bump-in completed within the agreed window.
- All equipment tested (vision, audio, lighting).
- Tech rehearsal run with presenters in position on stage.
- Confidence monitors tested with actual slides.
- Audio levels checked across the room, including back rows.
- Lighting cues (the planned lighting changes through the event) programmed and walked through.
- Recording or streaming equipment tested if applicable.
- Crew briefing held: roles, cue sequence, on-day contacts.
Day of (event day)
Live operation. Most of the work has been done. Now it runs.
- Operator briefed and at the desk before doors open.
- Q&A microphone management plan in operation (who hands the mic, where they sit).
- Speaker pre-event check-in: each presenter mic'd up and briefed.
- Run sheet on hand at the tech desk in the room (front of house) with all cues confirmed.
- Day-of contacts on speed-dial.
- Bump-out timing confirmed with venue.

What to share with your AV company (and when)
A useful shortcut: at each stage of the timeline above, there's usually a small set of documents your AV company needs from you. Sending them at the right time avoids both delays and last-minute scrambles.
- At booking (around 3 months out): event format, venue name, date, audience size estimate, budget range if comfortable.
- At 6-8 weeks out: floor plan, draft run sheet, brand guidelines, sponsor requirements.
- At 2-4 weeks out: final speaker list, microphone preferences per speaker, content delivery deadlines.
- At 1 week out: final run sheet, all speaker content (slides, video, audio), Q&A mic plan, day-of contact list.
If you're still drafting your AV brief, our guide to writing a proper AV brief covers what should go into the brief itself.
The 5 things most often missed on conference briefs
- No rehearsal time built into the bump-in window.
- Slide aspect ratios not confirmed with speakers (widescreen 16:9 vs the older, squarer 4:3, mismatches still happen).
- Q&A microphone management not planned (who hands the mic, where mic runners sit).
- Confidence monitors not specified, leaving presenters turning to read screens.
- No day-of decision-maker named, so on-the-fly changes stall.
Our list of common corporate AV mistakes covers what happens when these slip.
Frequently asked questions
When should I book AV for a conference?
For most conferences, around three months out is sensible. For larger events at popular Brisbane venues, four to six months out is wise. The busiest months in Brisbane sit between September and November, so book earlier if your event falls in that window.
What should be confirmed two weeks before a conference?
Final Presenter/Speaker list, microphone preferences per speaker, slide deck format and aspect ratio, content delivery deadlines, bump-in and bump-out windows, and rehearsal time blocked in the run sheet. Most last-minute scrambles trace back to one of these slipping past this point.
What does a tech rehearsal involve?
A walk-through of the full run sheet with crew and presenters in position. Presenters test their microphones, slides are advanced through, lighting cues are checked against the run sheet, and any AV transitions (video reels, panel changeovers) are walked. For larger conferences with more cues, the rehearsal can take an hour or more. Skipping it is the most common cause of an event feeling clunky.
What does the venue handle vs the AV company at a conference?
Generally, the venue handles building services (room access, in-house AV where used, catering, security, parking). The AV company handles production-specific scope (additional equipment, crew, run-sheet operation, content management). You as the organiser handle speakers, agenda, content and attendee communications. Where overlap exists (confidence monitors, in-house projection, lecterns), clarify ownership at the start of the project.
How long does conference bump-in take?
Depends on scope. A small single-room conference might bump in in three to four hours. A large multi-room conference with LED walls, staging and lighting design often needs most of the day before, or the full morning if the venue allows. Always include rehearsal time inside the bump-in window, not in addition to it.
Want a hand working through it?
A conference production timeline isn't about being process-heavy. It's about reducing the number of decisions that have to be made under pressure. The earlier the right things are locked in, the smoother every subsequent stage becomes.
If you've run conferences before and your timeline already works, this checklist is a useful health-check rather than a replacement for what you do. If you're running one for the first time, or running one at a new scale, it's a working template you can adapt.
If you'd like a hand working through it for an upcoming conference in Brisbane or SEQ, we'd be happy to walk through your timeline with you.